7a971c4c41 Add configurable override duration and hard-stop thresholds
Override duration (web UI):
- Dropdown on Ein button: 30min / 1h / 2h / 4h
- Engine notified immediately via ApplyOverride() — no waiting for
  next SyncHardwareState cycle
- Aus button always uses 1h lockout (keeps consumer off for 1h)

Hard-stop thresholds that cancel active overrides:
- SOC emergency brake: now also clears ManualOverride flag so EMS
  resumes full control after the safety shutdown
- override_max_import_w (default 800W): if grid import exceeds this
  while an override is active, override is cancelled immediately
  (no hysteresis delay — protection is instant)

Config: ems.override_max_import_w (0 = disabled)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-06 10:43:49 +02:00
99613c52ae Initial commit: EMS — Energie Management System
Complete self-consumption optimisation system for 7 kWp PV installation:
- Prometheus collector (grid power, SOC, PV, per-phase, compressor)
- Pure decision engine with SOC gates, hysteresis, priority ordering
- Shelly Gen1/Gen2 actuator (SHA-256 Digest auth, PM power readback)
- Viessmann OAuth2 client for DHW temperature control
- PV forecast integration (forecast.solar)
- Wallbox mutual exclusion (VX3 4.6 kW AC output constraint)
- Car-not-charging detection via Shelly PM
- Compressor idle → early SG-Ready release
- Per-phase grid power for single-phase wallbox decisions
- Manual override detection and web UI with override buttons
- Full unit test coverage for decision engine
- systemd service, Makefile, complete documentation

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-06 10:02:16 +02:00