0020f1268b Add EV charging advice notification to status page
Uses hourly PV forecast data (watts per hour from forecast.solar) to
find the first contiguous block of hours where:
  PV production - base_load_w >= min_surplus_w

Shows a blue advice card on the status page:
  "Auto einstecken bis HH:MM Uhr"
  "Erwartetes Überschuss-Fenster: HH:MM – HH:MM Uhr"

Card is hidden when:
- No surplus window found (weak forecast day)
- Window has already started or passed
- A wallbox is currently active (car already charging)

Config: forecast.base_load_w (1000W), forecast.min_surplus_w (1800W)
Timestamp parsing handles both "HH:MM:SS" and "HH:MM" key formats.
Today: surplus window 11:00–13:00 (24.3 kWh forecast).

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-06 10:30:58 +02:00
79828a46c5 Add status page enhancements and engine improvements
Status page:
- Per-phase grid power (L1/L2/L3) with export/import direction
- Shelly PM live power badge on active wallbox rows
- Compressor power shown below consumer list
- SyncDeviceStates() method on Store for PM power readback

Engine:
- Fix wallbox mutex: re-read Active state after P3 so same-cycle
  WallboxA activation correctly blocks WallboxB in P4
- Fix RecoverState: set ActivatedAt to zero so recovered consumers
  are immediately eligible for shutdown decisions
- Add 3 new unit tests: mutual exclusion, car-not-charging,
  compressor-idle early release

Makefile:
- make install no longer overwrites /etc/ems/ems-config.yaml if it
  already exists (prevents password loss on updates)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-06 10:06:01 +02:00
99613c52ae Initial commit: EMS — Energie Management System
Complete self-consumption optimisation system for 7 kWp PV installation:
- Prometheus collector (grid power, SOC, PV, per-phase, compressor)
- Pure decision engine with SOC gates, hysteresis, priority ordering
- Shelly Gen1/Gen2 actuator (SHA-256 Digest auth, PM power readback)
- Viessmann OAuth2 client for DHW temperature control
- PV forecast integration (forecast.solar)
- Wallbox mutual exclusion (VX3 4.6 kW AC output constraint)
- Car-not-charging detection via Shelly PM
- Compressor idle → early SG-Ready release
- Per-phase grid power for single-phase wallbox decisions
- Manual override detection and web UI with override buttons
- Full unit test coverage for decision engine
- systemd service, Makefile, complete documentation

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-06 10:02:16 +02:00